澳门正规网赌网址大全,佛罗里达州标志

941.743.1200
默多克圆环18500号
夏洛特港,佛罗里达州33948

移动菜单关闭图标
接近搜索

下水道服务

下水道备用紧急情况

拨打941.764.4300 (there is no charge for our 24/7 response service)

公用事业公司 staff will investigate if it is a Charlotte County 公用事业公司 or homeowner issue (a plumber will need to be called if it is a homeowner issue). If a plumber is called to the home before Charlotte County 公用事业公司 investigates, the homeowner will be responsible for the plumbing costs, even if it is found to be a Charlotte County 公用事业公司 issue. 

申请新的下水道服务

  • ​If the property does not yet have sewer service but is already adjacent to an existing sewer line, it may take two to three months to install a new service. 
  • If the property is in one of 这些项目 in the planning stage, sewer construction may begin once approved. For more information, visit the 公用事业项目页面.
  • Check the proximity to existing green or gold sewer lines on our 交互式实用程序地图.
  • Note that the map of existing lines does not reflect new projects currently under construction or in design.
  • To proceed with an availability request, fill out 和 submit this 可用性申请表格.
  • For additional questions, 联系 行政.Assistants@CharlotteCountyFL.政府 或拨打941.764.4300,选项3.

强制状态

​If the property is considered a m和atory connection, the property owner will receive a letter once the line has been installed 和 certified for use. If sewer is considered available as defined by Charlotte County Code Sec. 3-8-41, the owner will be legally required to pay utility connection fees. 房主, a m和atory connection means a wastewater collection line exists in an easement or right-of-way that abuts the property line, 和 for a non-residential property it is within fifty feet of the property line.

的 owner will have 180 days from the date of receipt to pay the connection fees 和 complete the connection to the home. If the owner does not pay the connection fees to the 公用事业部门, a lien will be placed on the property 和 filed in the Official Records with the Clerk of Court. After the initial 180-day period, the monthly sewer base facility charge will also begin to accrue 和 will appear on the bill in the next billing period. Failure to pay such charges will result in initiation of Charlotte County 公用事业公司' delinquency process.

For additional questions, 联系 行政.Assistants@CharlotteCountyFL.政府 或拨打941.764.4300,选项3.

缴交接驳费

​Utility connection fees are subject to change based on the 核定费率决议 at the time of the agreement to activate service.

全部付款 
Mail in payments or stop by our office to pay the full amount of the utility connection fees. 支付ing up front will lock in the current rate 和 save additional time, interest 和 fees in the future.

贷款融资
Property owners that have received a m和atory connection letter 和 cannot afford to pay the utility connection fees up front may qualify for a monthly loan. 的 公用事业部门 requires a down payment of at least 10% of the total due, 和 will record a lien on the property. Monthly payments are paid for 7, 10, 15 or 20 years at an interest rate equal to the Florida Prime Rate plus 2%.

税单评估
Several areas were approved for Municipal Service Benefit Unit (MSBU) sewer expansion projects. 的 assessment is divided into annual payments on a property owner's tax bill. 的 assessment stays with the property once it is sold, 和 does not need to be paid at the time of sale.

的 property may be connected to sewer if in one of our 目前的工程范围. Visit the project-specific page for the most recent status. If the property is in one of 这些项目 in planning stage, sewer construction may begin once approved.

物理连接

​Our service area has three different types of sewer systems that connect to our wastewater treatment facilities. Property owners cannot select the sewer type as it depends on the property's location 和 proximity to existing infrastructure. Each service type has different processes 和 homeowner responsibilities for physically connecting the home.


低压污水渠(LPS)


Customer's Responsibility: It is your responsibility to hire an electrician to install the electrical panel 和 a dedicated circuit breaker according to our 标准.
LPS is a low-head pressure waste collection 和 treatment system. 的 system basically consists of a control panel, 拦截坦克, 和 sump chamber unit which houses a small sewage effluent pump. 的 sewage effluent pump sends the liquid wastewater (effluent) through a small pressure line to a main pressure line 和 into one of our wastewater facilities for final treatment. 的 solid waste that remains in each homeowner's LPS tank naturally degrades.

的 system from the sewer tank to the wastewater plant is maintained by the 公用事业部门, including parts 和 labor costs. This includes the pumping out of the tank if solids build up. However, the house plumbing problems are the responsibility of the customer.

For existing homes (not new construction), our Field Technician will 联系 the property owner to deliver an electrical panel for the LPS service after the utility connections fees have been paid. It is the property owner's responsibility to hire an electrician to install the electrical panel 和 a dedicated circuit breaker according to our 标准. Once the electrical work passes inspection, our staff will place the address on their schedule to complete the work. This service can take up to 6 weeks or more to complete.

的 LPS utility connection fees currently include connection to the home, ab和onment of the current septic system 和 basic restoration of the yard. 请参阅 核定费率决议 和 call Engineering Services at 941.764.4300,选项3 to confirm the costs for the property.

资料丰富的LPS刊物:
关于LPS连接的常见问题
LPS屋主指南

重力下水道


Customer's Responsibility: it is your responsibility to hire a plumber to complete the connection to your home, ab和on the onsite septic system 和 provide a septic tank ab和onment permit # to 公用事业公司.
This is the traditional sewer system which consists of pipes from buildings to one or more levels of larger underground trunk mains, 和 above-ground lift stations, which transport the sewage to wastewater treatment facilities. Vertical pipes, usually made of precast concrete, called manholes, connect the mains to the surface.

的 sewer system from the street to the wastewater plant is maintained by the 公用事业部门, including parts 和 labor costs. However, house plumbing problems are the responsibility of the customer.

Once the utility connection fees have been paid, it is the owner's responsibility to hire a plumber to complete the connection to the home 和 ab和on the onsite septic system. Once the plumber has completed the connection, the owner or plumber must 联系 the 公用事业部门 to let us know the connection has been made. A septic tank ab和onment permit # must also be provided to 公用事业公司.

请参阅 核定费率决议 和 call Engineering Services at 941.764.4300,选项3 to confirm the costs for the property.

常见问题 about connecting to the gravity sewer system.

真空下水道


Vacuum sewer systems incorporate new technology that exists in the 东 & 西泉湖, El 工作ean阿克曼 项目区域. 在这种情况下, a central vacuum station is serving up to 1,900 homes which feed into our central wastewater system.

的se property owners have the option to pay their utility connection fees, physical connection fees 和 septic tank ab和onment fees up front or via a 20-year assessment on their annual tax bill.

Since the assessment includes the physical connection 和 septic ab和onment, property owners do not need to hire a plumber.

未来的可用性 

2016年10月, Charlotte County 公用事业公司 began developing its 污水渠总体规划 (CCSMP), which is a road map for future development of sewer 和 wastewater systems in Charlotte County. 的 CCSMP will identify geographic areas that will be prioritized for the next five to ten years.

污水渠总体规划 资源 和 Updates

In addition to those priority areas, 公用事业公司 is also constructing line extensions to connect new homes that are close to an existing line. Properties along the line extensions will transition to a m和atory status once the line in constructed, regardless of whether the owner requested the service.

To proceed with an availability request, fill out 和 submit this 可用性申请表格. For additional questions, 联系 行政.Assistants@CharlotteCountyFL.政府 或拨打941.764.4300,选项3.

Delivering Exceptional Service

问题? 问题?

澳门正规网赌网址大全