Charlotte County, FL Logo

941.743.1200
默多克圆环18500号
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

项目状态 Updates

公共工程 Ian Projects

Hurricane Ian Projects

Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

吉尔特 & Blitman水道

吉尔特 & Blitman水道

Last Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发

吉尔特 Blvd roadway reconstruction

阅读更多

Various Intersection Improvements 正规澳门赌博网址大全 Image

Various Intersection Improvements

Last Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发

The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, 科克伦大道, Peachland大道, and Veterans Boulevard.

阅读更多

Placida West Boat Ramp Expansion 正规澳门赌博网址大全 Image

Placida West Boat Ramp Expansion 销售税项目

Last Updated: 04/12/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: 设计开发

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak发射, 厕所, 和停车.

阅读更多

Ainger Creek Boat Ramp Replacement 正规澳门赌博网址大全 Image

Ainger Creek Boat Ramp Replacement

Last Updated: 04/12/2024 Category: 公园和娱乐 当前阶段: 设计开发

This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent 厕所 facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.

阅读更多

Bridgeless Barrier Islands Accessibility Study 正规澳门赌博网址大全 Image

Bridgeless Barrier Islands Accessibility Study

Last Updated: 04/12/2024 类别:其它 当前阶段: Planning and Project Approval

This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, 货物, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, 唐佩德罗岛, and Knight Island/Thornton Key. 

阅读更多

Family Services Center - Phase 2 正规澳门赌博网址大全 Image

Family Services Center - Phase 2 销售税项目

Last Updated: 04/12/2024 Category: 已缴纳的销售税 Category: 县设施 当前阶段: Turnover and Closeout

Completed the 人类服务 integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the 人类服务' staff offices were constructed along with critical shared support facilities, 制造商的空间, and expanded services. 
 

阅读更多

South Gulf Cove Bridge Repairs  - 建设

South Gulf Cove Bridge Repairs - 建设

Last Updated: 04/09/2024 类别:桥梁 当前阶段: 建设

South Gulf Cove Bridge Repairs - (桥梁 #014053, #014054, #014055, #014056)

阅读更多

Midway Boulevard Bridge over North Spring Lake - Bridge 014073

Midway Boulevard Bridge over North Spring Lake - Bridge 014073

Last Updated: 03/29/2024 类别:桥梁 当前阶段: 设计开发

Midway Boulevard Bridge over North Spring Lake - Bridge #014073

阅读更多

Rotonda Bridge Rehabilitations Design #5 - 桥梁 014060, 014063 and 014100

Rotonda Bridge Rehabilitations Design #5 - 桥梁 014060, 014063 and 014100

Last Updated: 03/29/2024 类别:桥梁 当前阶段: 设计开发

Rotonda Bridge Rehabilitations Design #5 - 桥梁 014060, 014063 and 014100

阅读更多

Delivering Exceptional Service

问题? 问题?

澳门正规网赌网址大全